Author: City of Linden
Cranford Avenue Resurfacing
Please be advised that concrete work (handicap ramps, curbs and sidewalks damaged by city tree) will commence on Monday, July 29th, 2019 for the above referenced project.
We estimate 2-3 weeks (weather permitting) for this work followed by milling and paving.
Flyers have been distributed to the residents.
The LPD Traffic Bureau will be posting Emergency No Parking Signs.
The roadway will be open to traffic at this time while work is performed on one side at a time.
An Inspector from the Engineering Department will be onsite a majority of the time.
The main contractor is DLS Contracting and his concrete sub is FDM.
Please advise the Engineering Department of any concerns.
All DPW garbage, recycling and trash pickups will remain the same.
Aries Clean Energy Completes Environmental Permitting for World’s First Large-Scale Biosolids Gasification Facility
LINDEN, NJ and FRANKLIN, TN – (July 15, 2019) –Aries Clean Energy has received all approvals required to construct New Jersey’s first biosolids-only gasification facility. The plant will bring environmental and sustainable benefits to the area by processing 400 tons of biosolids daily into clean renewable energy.
“Aries patented gasification system eliminates the need for environmentally harmful landfilling or incineration of biosolids, while producing beneficial renewable energy and biochar. We believe this truly is a beneficial and disruptive technology that will revolutionize the wastewater treatment industry and establish itself as the best available control technology for biosolids disposal” – Gregory Bafalis, CEO Aries Clean Energy